
New TopShim run:

version = topshim 2.0.0
date = 2024-05-16
time = 20:22:04.393
command = topshim  convcomp tuneaxyz

1D SHIMMING

Parameters:

maximum order = 5
probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm
optimisation parameters = ls
linewidth 1H = 0.10 Hz
envelope shape / strictness = 2.00 / 200

Results:

tune lock level increase = 1.3

initial B0 stdDev = 4.09 Hz
sample size = 2.65 cm, position = 0.11 cm
final B0 stdDev = 0.33 Hz > improvement = 12.5
envelope width = 0.74 Hz

Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	+17
Z2	-59
Z3	+89
Z4	-314
Z5	+108
X	-60
Y	+142

duration = 3 min 36 sec
completed successfully
finished Thu May 16 20:25:39 2024


========================================================================
